SC-5011 Air Intake Filter Test System Shipped Successfully with End-to-End Technical Support

يشارك:

جدول المحتويات

The SCPUR SC-5011 Air Intake Filter Test System has completed factory inspection, packing verification and transport protection and has now been successfully loaded and dispatched. The system will be used for laboratory performance evaluation of air cleaners, supporting the customer’s product development, quality validation and consistency control.

Air Cleaner Performance Evaluation in Accordance with ISO 5011

The SC-5011 is designed in accordance with ISO 5011:2025, Inlet air cleaning equipment for internal combustion engines and compressorsPerformance testing. The standard defines uniform test procedures, test conditions, equipment requirements and reporting methods for direct laboratory comparison of air cleaners used in automotive and industrial applications.

The SC-5011 addresses the performance characteristics most relevant to air cleaner evaluation:

  • تقييد تدفق الهواء: measures restriction or differential pressure at specified airflow rates to evaluate airflow performance.
  • الكفاءة الوزنية: evaluates the dust collection efficiency of the air cleaner using controlled dust feed and mass measurements.
  • سعة الغبار: records restriction development and accumulated dust mass until the specified terminal condition is reached.

The system integrates closed-loop airflow control, nozzle-based airflow measurement, differential pressure measurement, تحميل الغبار, وزن, test-item adaptation and automated reporting. Consistent control of the test condition and loading process provides repeatable and traceable data for product development, ضبط الجودة, supplier evaluation and independent laboratory testing.

Standardized Pre Shipment Inspection and Layered Transport Protection

The SC-5011 consists of the fan section, nozzle flowmeter duct sections, terminal absolute-filter duct section, test-item connection assemblies, dust feeding and weighing system, control cabinet, and associated electrical and pneumatic components. Because the system contains multiple modules that must be reassembled on site, the project team verifies the main modules, duct sections, accessories, أدوات, cables and pneumatic tubing before dispatch. Component numbers and interface labels are checked against the delivery documentation at the same time.

Layered transport protection is used for this shipment. Transparent stretch film first secures the equipment and provides dust protection. The modules are then sealed in aluminized barrier film and vacuum packed for moisture protection, followed by an outer wooden crate for transportation. Large modules are secured on pallets or timber supports, while critical interfaces and vulnerable areas receive additional cushioning to reduce the risk of moisture exposure, impact and movement during long-distance transport.

Installation Made Clear with Actual Photos and Interface Labels

The SC-5011 is shipped in modules to accommodate transport dimensions and site conditions. The installation documentation uses actual equipment photographs, component numbers and interface labels as the primary identification references. It covers arrival inspection, unpacking, equipment positioning, mechanical assembly, electrical and pneumatic connections, release of transport-protection devices, and checks before initial power-up.

During on-site assembly, adjacent duct sections, cables and pneumatic tubes are connected according to their matching interface labels. Installation begins with the fan and nozzle flowmeter sections, followed by the terminal absolute-filter section, weighing equipment, control cabinet and auxiliary systems. The consistent numbering and photo references help reduce component mix-ups and incorrect connections, making the installation process easier to follow.

Support Continues from Delivery through Commissioning

After dispatch, SCPUR continues to support arrival inspection, installation and commissioning. The supplied guide covers packaging inspection, component verification and basic installation. At key connection and power-up stages, our engineers can remotely verify the system layout, power supply and protective earthing, pneumatic pressure, and the connection status of sensors and actuators.

Initial power-up and system commissioning are carried out under the remote guidance of SCPUR engineers. With a stable network connection, the team can assist with control-system checks, motion verification, parameter review, trial operation and fault diagnosis, and answer application questions. This process helps reduce installation errors, shorten start-up and support reliable operation after commissioning.

From standard interpretation and system design to manufacturing, shipment and commissioning, our objective is to deliver a practical, repeatable and sustainable air cleaner performance evaluation capability. Our team will continue to follow the SC-5011 project through installation, commissioning and successful entry into service.

Contact SCPUR to discuss SC-5011 test ranges, air cleaner configurations and project requirements.

ايزو 5011

تواصل معنا

قبل أن تذهب...

غير متأكد من المعيار الدولي الذي ينطبق على مشروعك? تحدث مع كبار المهندسين لدينا للحصول على تقييم فني شخصي بناءً على خبرتنا الصناعية الممتدة على مدار 10 سنوات.

*نحن نحترم سريتك وجميع المعلومات محمية.

تحقق من جودتك من خلال أنظمة الاختبار القياسية العالمية

خبراؤنا على استعداد لتصميم حل مخصص لك. أخبرنا عن مشروعك, ودعنا نتحقق من جودتك بدقة وسرعة.

مخصص ر&د & حلول مخصصة

مخصص ر&د & حلول مخصصة

الامتثال للمعايير العالمية

الامتثال للمعايير العالمية

100% نظام برمجي مطور ذاتيًا

100% نظام برمجي مطور ذاتيًا

المعايرة عن بعد & الدعم العالمي

المعايرة عن بعد & الدعم العالمي

اتصل بنا

*نحن نحترم سريتك وجميع المعلومات محمية.

This page has been automatically translated from the English original for convenience. Product models, standards, numerical values and technical limits should be verified against the English version. Please contact SCPUR for project-specific confirmation.